Malaysia

High RM38.5 mil cost for Seri Perdana facelift to fix leaky roofs, faulty wiring

Special Functions Minister Datuk Abd Latiff Ahmad says 12-year-old complex has fair share of damage

Updated 5 years ago · Published on 29 Sep 2021 4:50PM

High RM38.5 mil cost for Seri Perdana facelift to fix leaky roofs, faulty wiring
The Seri Perdana Complex, completed in 1999, is the official residence of the prime minister of Malaysia. – Bernama pic, September 29, 2021

by The Vibes Team

KUALA LUMPUR – Plans to renovate the Seri Perdana Complex for RM38.5 million was given the green light in March this year under the purview of then prime minister Tan Sri Muhyiddin Yassin. 

In a statement in response to the controversy surrounding the high cost involved for the official residence of the prime minister, Special Functions Minister Datuk Abd Latiff Ahmad said the 22-year-old complex, which began construction in 1997 and was completed in 1999, had suffered numerous damage over the years.

“As such, the Public Works Department (PWD) had prepared a scope of restoration works, with the overall cost at RM38.5 miliion for the project, including for works to fix the electrical wiring systems and roof leaks within the complex.

“The project was approved on March 19 and repair works commenced on March 29. All works are scheduled to be completed by December 7 this year,” he said.

He added as of today, the restoration works are 74% completed compared with the estimated 71% as per schedule. 

Latiff’s response comes after Prime Minister Datuk Seri Ismail Sabri Yaakob told the Dewan Rakyat that the renovations at Seri Perdana are necessary to ensure safety, as well as to preserve the country’s image during visits by key dignitaries.

The explanation comes after Datuk Mahfuz Omar (Pokok Sena-PH) sought justification for the spending at a time when Malaysians are reeling from the effects of the Covid-19 pandemic.

In a parliamentary reply, the prime minister said the improvements include electrical wiring and mechanical works, as well as works on the air-conditioning systems and structural modifications to the official residential block.

Old and dilapidated furniture were replaced in accordance with the status of Seri Perdana, he had said.

He had also said the progress of the renovations stood at 60% as of August 31. – The Vibes, September 29, 2021

Related News

Opinion / 1mth

Najib’s conditional home‑detention sentence: Legitimate mercy must not turn into systemic privilege

Malaysia / 3mth

Altantuya case is about truth, accountability, not compensation, says former Mongolian PM

World / 4mth

UK Prime Minister Keir Starmer announces resignation

Malaysia / 11mth

Cabinet reshuffle? Guessing game begins

Opinion / 1y

Malaysia’s pretenders and their unholy game with race and religion

Malaysia / 2y

Anwar won’t host Hari Raya open house to save money

Spotlight

Off beat

Paya Terubong landslide: MBPP submits draft report

By Ian McIntyre

Malaysia

Bersatu, Muda sign CSA with Madani govt to back Budget 2027

By Alfian Z.M. Tahir

Malaysia

Syndicate using AI-generated 'Datuk' woman to deceive public

Malaysia

MIPP withdraws from Melaka polls after failed negotiations with PN

Malaysia

Thirteen suspended Bersatu MPs may be excluded from MADANI government deal

Malaysia

Selangor Sultan urges scholars to speak truth, leaders to respect constructive criticism

Malaysia

691 teachers flagged for immediate psychological intervention, says Fadhlina

By Alfian Z.M. Tahir

You may be interested

Malaysia

Sabah, Sarawak agree in principle to secure 35% of parliamentary seats

Malaysia

Melaka PRN: Ab Rauf, Ridhwan face PH challengers in straight fights in Melaka polls

Malaysia

PAS’ partnership with Umno: A double-edged sword?

By The Vibes Says

Malaysia

Three arrested after man suffers broken leg in car-ramming over loan dispute

Malaysia

7,292 Penang civil servants to receive one-month bonus in December

By Ian McIntyre

Malaysia

PN yet to name Kota Laksamana candidate after MIPP's last-minute withdrawal

Malaysia

Govt weighs movement controls for Rohingya refugees, says Zahid

Malaysia

Bursa urged to turn more local firms into regional players, create high-skilled jobs